the plans,
the crew,
the cost per sqft.
one layer.

Layer takes a trade contractor from the blueprint to the last invoice. Measure the drawings, price the scope, run the crew from their phones, and watch actual cost land against the estimate while the job is still open.

scaffoldingstucco & EIFSplasterframingany trade priced by the sqft
Request pilot access →Private pilot · a person reads every request
Sign in ↗For companies already in the pilot
Riverbend PlazaHarbourview Lofts 2Unit 12 · scaffold
TakeoffEstimateCrewHealth
A-201 · Unit 204 · Level 2 · 1/4" = 1'-0" SelectAreaLengthDeduct 142% Sheet · 699.00 sqft · 44.00 lf
The takeoff canvas. Areas and lengths are drawn on the plan sheet and tagged to a scope as you go.Every screen works on a phone, a tablet and a desk.

less chasing.
more knowing.

The job is one thing. Layer keeps the drawings, the crew and the money attached to it, so nobody rebuilds the story from three apps and a spreadsheet.

Takeoff · A-2014 sheets
Portland cement plaster1,525.50 sqft
EIFS · parapet412.00 sqft
Control joint86.00 lf
Priced from your book$34,112

measure once.
use it everywhere.

Draw the takeoff on the plan sheet. The same measurements price the estimate, shape the crew sheet and set the target the health meter is judged against.

Crew sheet · TueRiverbend
Base coat · L2 east
6 on scope
4:12 running
EIFS parapet
3 on scope
2:40
Photos · L2 east
2 of 4 areas
Needs you

the field is
the office.

Foremen run the day from a phone: who is on which scope, for how long, with the photos to prove it. Time lands on the scope the moment it is logged.

Health · day 23 of 4058%
Actual to date$4.82 /sqft
Estimated$4.60 /sqft
Base coat · L3Over
EIFS parapetUnder

know today,
not at month end.

Actual cost per square foot against the estimate, per scope, updated every day. See the plaster running hot while there is still time to move people.

how a job runs
on Layer.

Seven steps, one record. Each one hands the next exactly what it needs.

1Takeoff

measure the drawings, not a spreadsheet.

Every quantity is drawn on the sheet it came from, tagged to a scope and a level, and stays clickable for the life of the job.

  • Areas, lengths, deductions. Draw on the PDF at scale. Openings come off when you mark them.
  • Scoped from the first click. Each measurement carries its CSI section and elevation, so the estimate and the crew sheet already know where it belongs.
  • Share a read-only takeoff. One link shows the GC exactly what was measured. No login.
Takeoff summaryRiverbend Plaza · 4 sheets
Portland cement plaster
09 24 00 · L2, L3, L4
4,118.50 sqftPriced
EIFS · parapet & soffit
07 24 00 · Roof
1,296.00 sqftPriced
Control joints
09 22 00 · All levels
612.00 lfPriced
Window returns
09 24 00 · 38 openings
418.00 lfUnpriced
Deductions
Windows, doors, louvres
−684.00 sqftAuto
Shared with the GC · read-only link · opened 3×Copy link
2Estimate

price it from your own book. send it. get it accepted.

The takeoff becomes an estimate without retyping. Your service items, loaded labour rates and material prices do the arithmetic.

  • A pricing book that is yours. Service items, crew rates with burden, material costs. Change a rate once and every open estimate knows.
  • A portal, not a PDF. The client opens a link, reads the scope and accepts it. Acceptance is recorded, not emailed around.
  • Change orders with their own acceptance. Extra work gets priced, sent and signed the same way. Nothing rides on a verbal.
Estimate · Riverbend PlazaAccepted Sep 12
Exterior plaster system · L2–L4
4,118.50 sqft × $28.40
$116,965
EIFS parapet & soffit
1,296.00 sqft × $34.10
$44,194
Control joints
612.00 lf × $9.75
$5,967
Scaffold, 8 weeks
Rental contract RC-0231
$17,194
Estimate total$184,320
Change order #2 · Added soffit returns
Sent to client · awaiting acceptance
+$6,410
3Field

the crew runs the job from their phones.

Foremen get a crew sheet for the day, not a timesheet at the end of the week. Hours land on the scope they were spent on, and photos become evidence attached to the job.

  • Crew sheet per day, per site. Who is on, what scope they are on, how long. Sign-off at the end of the shift.
  • Photos are evidence, not a text thread. Every picture is filed to the project and the day, and the 6 p.m. reminder asks the supervisor for them.
  • Installs from the browser. Home-screen app, push notifications, no app store. Stop-work is one tap and everyone on the job sees it.
  • Say what's wrong once. A photo and a sentence from the field becomes a tracked card. The reply rings the phone of the person who reported it.
Tue Sep 29 · Crew sheet
Riverbend Plaza
09 24 00 · Base coat · L2 east6 on scope4:12D. Okafor · M. Reyes · J. Tran +3
07 24 00 · EIFS parapet3 on scope2:40A. Petrov · S. Gill · L. Ng
Scaffold · move to L32 on scope1:05R. Bains · K. Wolfe
+
Supervisor pictures due 6:00 PM2 of 4 areas photographed today
Sign off today's sheet
Card · from the fieldNeeds · you
M. Reyes · Foreman · 2:14 PM
Scaffold tie at L3 east is missing the bracket on the drawing. Can we get the detail?
Layer · 2:31 PMDetail 5/A-501 attached to the project. Tie spacing is 4'-0" here, not 6'-0". Marked on the sheet.
M. Reyes · 2:33 PMGot it, thanks. Resolved
4Health meter

actual against estimate, per square foot, while the job is still open.

Because hours land on a scope and material comes from the book, Layer knows what each scope actually costs every day. Not at the end of the month.

  • Per scope, not per job. See the plaster running hot while the parapet is under. Move people before the week is lost.
  • Loaded labour, real burden. Rates carry burden, bonus rules and working hours, so the number is what the crew costs, not what they are paid.
  • Rentals and materials counted. Rental contracts, damage charges and material draws hit the scope they were used on.
Health · Riverbend PlazaDay 23 of 40 · 58% complete
Actual to date$4.82 /sqft
Estimated$4.60 /sqft
Base coat · L2
1,525 sqft · 100% complete
Under
Base coat · L3
1,318 sqft · 64% complete
Over
EIFS parapet
1,296 sqft · 40% complete
Under
Control joints
612 lf · 55% complete
Watch
L3 base coat is 4.1 h/100 sqft against 3.2 estimated. Six workers on scope since Monday.
5Yard & rentals

know what is in the yard and what is on rent.

Scaffold, forms and gear are tracked by item, by location and by job. Rental contracts bill monthly from what is actually out.

  • Yard stock against on-rent. Every movement is logged, so the number on the screen is the number in the yard.
  • Rental contracts and billing runs. Contracts price from the catalog, the client sees them in a portal, and the month closes as one run.
  • Damage charges that stick. Returned short or broken is recorded against the contract, not remembered.
Inventory · Scaffold catalogMain yard
ItemIn yardOn rent
Frame 5' × 6'4"
SC-FR-5064
1,2403,8604 sites
Cross brace 7'
SC-XB-0700
2,0154,1104 sites
Aluminum plank 7'
SC-PL-0700
861,412Short
Screw jack 24"
SC-SJ-0024
6401,1903 sites
Billing run · September
14 contracts · 3 damage charges
$62,190
6Safety

certifications, forms and the site library, next to the job.

The safety binder lives with the project it belongs to. Workers' tickets, daily forms and the documents an inspector asks for are one tap from the crew sheet.

  • Certifications with expiry. Who is current, who expires this month, who cannot go on the lift.
  • Forms from the phone. Hazard assessments, toolbox talks, inspections. Filled on site, filed to the day.
  • Library and archive. Safety manual, SDS sheets, signed forms. Kept per project, findable years later.
Certifications · crew on siteRiverbend Plaza · 11 workers
D. Okafor
Fall protection · Aerial lift · First aid
Current
M. Reyes
Fall protection · Scaffold competent person
Current
J. Tran
Aerial lift expires Oct 12
14 days
K. Wolfe
Fall protection expired Sep 3
Expired
Hazard assessmentToday · signed
Toolbox talkMon · 9 present
Scaffold inspectionDue today
7Hand off

your numbers leave the way your office wants them.

Nothing is trapped. Payroll, rental billing, estimates and invoices go out as files or straight into the books.

QuickBooks OnlinePayroll exportRental billing runEstimate pushCSVXLSXRead-only share links

a private pilot.
built with, not sold to.

Layer is being built with a small group of trade contractors on real jobs. Access is by invitation, and a person reads every request.

invite
only.

No self-serve sign-up. We set up your company, invite the first owner, and they invite the team.

Request pilot access →

what pilot companies get ∞

  • 01The whole product: takeoff, estimates, crew sheets, health, inventory, rentals and safety.
  • 02Every screen on phones, tablets and desks. Installs from the browser, no app store.
  • 03The people building it, in the loop. Report from the field, get a reply on your phone.
  • 04Your data, exportable any time. CSV, XLSX and QuickBooks Online.

Pilot terms are agreed per company. Submitting a request does not create an account.

fair
questions.

Do my crews need to install an app?

No. Layer runs in the phone's browser and installs to the home screen from there, with push notifications. There is nothing to find in an app store and nothing for IT to manage.

What do we need to start?

A plan set as a PDF and a job you are about to run. Takeoff happens in the first sitting. Crew sheets start the day your foremen sign in on their phones.

Does it replace our accounting?

No. Layer is the job side: takeoff, estimate, field time, cost and rentals. Estimates and invoices push to QuickBooks Online, and payroll and billing leave as exports.

Who can see what?

Roles and capabilities are set per company. A foreman sees the crew sheet and the job; the office sees pricing, health and billing; a client sees only the portal link you send.

Where does our data live?

On Layer's servers in Canada, backed up daily. It is yours: export it any time as CSV or XLSX.

What does the pilot cost?

Terms are agreed per company during the pilot. There is no public price list yet, and nothing is charged on a request.

every job starts
with a takeoff.
let's start yours.

Tell us about the work you want to run on Layer. A person reads every request. If it fits, we set up your company and invite the first owner.

· Accounts are created by invitation only. · Pilot operators get the product, the people building it, and a say in what ships next. · Submitting this form does not create an account.

Request pilot access